I am unable to understand you with two voices talking at once.
Katie Brym
22:51
For the Volunteer PMW - should we include volunteers that will be recruited and managed by a staff member, or do all of the volunteers have to be directly recruited by an AmeriCorps member?
Briana Lane
26:03
This is pretty detailed information-can we slow down a little?
Jody Weseman
26:28
On eGrants, there is a character limit in the Intervention section. Is this glitch?
George Spencer
29:31
I am not able to read the examples at this speed.
George Spencer
30:01
Could we slow down?
Briana Lane
30:35
You will be posting this afterwards, I hope!
Jody Weseman
31:14
Yes, she mentioned she will post after on the announcement website. Then we can pause:)
Briana Lane
33:16
National measures tie to specific out comes, correct?
Briana Lane
44:20
Does the system identify math errors? i.e. if you haven't matched to the MSY's does it notify you?
Jody Weseman
45:38
Can we compete nationally if we don’t use NPMs?
Kao Ye Thao
47:35
@Briana and George, sorry about that! We want to make sure there's ample time for questions. Please refer to the slides after the presentation to review the examples. We'll be mindful of speed on the next one :)
Briana Lane
49:35
Patrick- yes it is e-grants and we love it! Thanks for the laugh!
Katie Brym
50:12
We currently have a member slot dedicated to Recruitment Capacity that was added through a special process with CV. Should we include this role and performance measure in our application?
Mallika Dhapodkar
50:26
Can you share the recording or PPT, Thanks
George Spencer
50:50
Thanks @Kao!
Katie Brym
52:36
What do we do for the prior data row if we are missing prior data due to data collection limitations during COVID-19?
Jody Weseman
55:23
Will CV review eGrants before submitting?
Jody Weseman
55:57
Can you elaborate on this question? I. If using a National Performance Measure, how the instrument meets the data collection requirements outlined in CNCS Performance Measures Instructions:?
Briana Lane
57:25
Do the PMWs factor into the Program Evaluation points? Does their alignment factor into the point evaluation process?
Zia Schatz
58:01
How important is it to not have Acronyms in the PMW sheet while keeping our character limit? Are the same people reviewing the narrative and PMWs or do they need to stand alone.
Jody Weseman
58:17
Thanks!
Zia Schatz
01:00:32
Got it thanks.
Kao Ye Thao
01:01:08
https://www.californiavolunteers.ca.gov/grants/americorps/2021rfa/
Kao Ye Thao
01:01:13
Funding Opportunity Webpage
Jody Weseman
01:01:27
Can I ask a non-PMW question? Page 12 of instructions - in the Evidence Tier section of the application narrative, applicant must summarize the study design and key finding of any outcome or impact evaluation reports submitted. What if we created a eval is a “Process Evaluation”
Kao Ye Thao
01:01:29
We will be posting the recording and powerpoint
Katie Brym
01:03:26
We would like to include the K-12 Success performance measurement with two outputs (ED5A and ED27C) for the same beneficiaries (students). Sometimes we're asked to put these in separate performance measurements, sometimes we're asked to do one. If we're reporting on two outputs with the same outcome should they both be included in the same performance measurement or separate?
Katie Brym
01:04:40
got it thanks!
Kao Ye Thao
01:06:07
https://www.californiavolunteers.ca.gov/grants/americorps/2021rfa/
Kao Ye Thao
01:06:10
Find FAQ here
Marta Hernandez
01:06:13
Will the recordings be available for us?
Kao Ye Thao
01:06:46
@Marta, yes! We will posting them on the webpage linked above
Briana Lane
01:06:56
Thank you!
Marta Hernandez
01:07:01
Thank you
Zia Schatz
01:07:50
Thank you